back to overview

Munich Olympic Hall

Munich, Germany

Facts Details used materials show on map Contact us

Facts

Realization membrane structures
Hightex
Year
2009
Client

SWM Stadtwerke München GmbH

City
Munich, Germany
Roof Area
18000 m²
Architect

Auer+Weber+Assoziierte, Germany

Engineering

Schlaich, Bergermann and Partners, Germany

location
Europe

Details

Hightex was chosen to replace the suspended membrane roof system of the Olympic Hall, a part of the Olympic Centre in Munich, which hosted the Olympic Games in 1972. The Olympic Hall is regularly used to host exhibitions, concerts staged by world famous artists, and other annual events such as the well-known six-days cycling race.After 36 years the triple layer insulated membrane system, totalling some 18,500 square meters, needed to be renewed.The membrane system is installed below the transparent plastic sheet roof and required a custom installation concept, which Hightex developed specially for the project. Hightex was awarded the contract based on its sound technical solution for this prestigious project. Hightex has previously worked on several projects for the City of Munich.

used materials

material

Contact us

Contact us

contact

fields

Phone/ Fax

+49 8051 6888-0

+49 8051 6888-290

Approach

Hightex GmbH

Rosenheimer Straße 46d

83059 Kolbermoor

Germany

Anfahrt