back to overview

Hugo Boss Competence Centre

Coldrerio, Switzerland

Facts Details used materials show on map Contact us

Facts

Realization membrane structures
Hightex
Year
2006
Client

Hugo Boss Industries, Coldrerio

City
Coldrerio, Switzerland
Roof Area
1045 m²
Contractor

Berlinger Holzbau, Alberschwende, Austria

Architect

Matteo Thun & Partner, Milan, Italy

location
Europe

Details

Architectural Dress for Creative Fashion Maker

The architect and designer Matteo Thun, whose office is based in Milan, demonstrates with his light and airy Centre for Design and Development how to dress up the creative fashion designers of Hugo Boss with appealing architecture.The roof above the emergency exit balconies is made of a semi transparent membrane, an open glass weave laminated with PTFE. The membrane consists of 12 individual bays, which are clamped linear to the wooden glulam structure with powder coated aluminium clamping profiles. The membrane is separated from the timber with a protection gasket. Stainless straps across adjacent clamping lines of the individual membrane bays provide a horizontal force transfer.

used materials

material

Contact us

Contact us

contact

fields

Phone/ Fax

+49 8051 6888-0

+49 8051 6888-290

Approach

Hightex GmbH

Rosenheimer Stra├če 46d

83059 Kolbermoor

Germany

Anfahrt