Bukit Jalil National Stadium
Kuala Lumpur, Malaysia
Project was implemented by a predecessor of Hightex GmbHFacts
- Realization membrane structures
- Koch Hightex GmbH
- Year
- 1997
- Client
ACPI Engineering Sdn. Bhd
- City
- Kuala Lumpu
- Roof Area
- 39000 m²
- Architect
Weidleplan Consulting
- Engineering
Schlaich Bergermann & Partner
- location
- Malaysia
Details
The realization fo the membrane structure has been realized by the Hightex predecessor, Koch Hightex GmbH.
used materials
- material
Contact us
Contact us
Phone/ Fax
+49 8051 6888-0
+49 8051 6888-290