back to overview

AlAin, Ceremonial Hall

Project was implemented by a predecessor of Hightex GmbH Facts Details used materials show on map Contact us

Facts

Realization membrane structures
B&O Hightex GmbH
Year
2003
City
Al Ain, United Arab Emirates
Roof Area
2000 m²
location
UAE

Details

The realization fo the membrane structure has been realized by the Hightex predecessor, named B&O Hightex GmbH.

used materials

material

Contact us

Contact us

contact

fields

Phone/ Fax

+49 8051 6888-0

+49 8051 6888-290

Approach

Hightex GmbH

Rosenheimer Stra├če 46d

83059 Kolbermoor

Germany

Anfahrt